ONGOING PROJECTS

Pipe Line Inspection and Blasting Painting

Client: Saudi Aramco

Location: Yanbu – COT

Pipe line inspection and Blasting painting -Saudi Aramco COT, Yanbu

EPC of Anti Drone Project

Client: Lubref

Location: Jeddah

 Anti Drone Project @ Lubref Jeddah

EPC of Anti Drone Project

Client: Lubref

Location: Yanbu

Anti Drone Project @ Lubref Yanbu

RTR Project

Client: Saudi Aramco

Location: Yanbu Refinery , Saudi Arabia

TPH Analyzer Project

Client: Saudi Aramco

Location: Yanbu Refinery

Installation Of New Hydrogen Backupline

Client: Saudi Aramco

Location: Yanbu Refinery , Saudi Arabia

The objective of the hydrogen project is to maintain the DHT (V05), LSRNHT (V17), HSRNHT (V09), and ISOM Unit (V18) running during unplanned platformer shutdown. The hydrogen (99.9%) can be imported from ALAR Company and then mixed with sales gas to reduce the hydrogen purity and increase the molecular weight to match the DHT operation design. Also, for the NHTs and ISOM units, the hydrogen mixed with sales gas will be further mixed with C3 to increase the molecular weight to 9.5 to meet the compressor (V11-K-0106) operation design. Moreover, the pure hydrogen can be used during the AET shutdown by injecting hydrogen into the pipe feeding the DHT to raise the purity.

We Provide the Best Service in Industry​

Open chat
Leave a message.