Pipe line inspection and Blasting painting -Saudi Aramco COT, Yanbu
EPC of Anti Drone Project
Client: Lubref
Location: Jeddah
Anti Drone Project @ Lubref Jeddah
EPC of Anti Drone Project
Client: Lubref
Location: Yanbu
Anti Drone Project @ Lubref Yanbu
RTR Project
Client: Saudi Aramco
Location: Yanbu Refinery , Saudi Arabia
TPH Analyzer Project
Client: Saudi Aramco
Location: Yanbu Refinery
Installation Of New Hydrogen Backupline
Client: Saudi Aramco
Location: Yanbu Refinery , Saudi Arabia
The objective of the hydrogen project is to maintain the DHT (V05), LSRNHT (V17), HSRNHT (V09), and ISOM Unit (V18) running during unplanned platformer shutdown. The hydrogen (99.9%) can be imported from ALAR Company and then mixed with sales gas to reduce the hydrogen purity and increase the molecular weight to match the DHT operation design. Also, for the NHTs and ISOM units, the hydrogen mixed with sales gas will be further mixed with C3 to increase the molecular weight to 9.5 to meet the compressor (V11-K-0106) operation design. Moreover, the pure hydrogen can be used during the AET shutdown by injecting hydrogen into the pipe feeding the DHT to raise the purity.